

Sector-Specific MEP BIM Coordination
Every facility category presents distinct physical constraints, acoustic criteria, and statutory codes resolved prior to site fabrication.
Healthcare & Laboratories
Aviation & Infrastructure
Towers & Mixed-Use
Medical gas piping networks, negative-pressure cleanroom cascading, HEPA filtration duct sizing, and sterile corridor containment models.
Heavy utility spine routing for airport terminals, redundant cooling loop topology for data centers, and high-capacity electrical distribution.
Vertical riser shaft optimization, tenant BTU submetering networks, acoustic silencer integration, and central chiller plant energy modeling.


Regional Code Compliance
We validate every MEP schematic and 3D coordination package against regional regulatory frameworks, including Saudi Building Code provisions, Egyptian Fire Safety Codes, NFPA life-safety standards, and ASHRAE ventilation benchmarks.
Our engineers calculate smoke extract velocities, pump head losses, and civil defense containment in the federated model, eliminating permit delays and expensive on-site rework.
